Home / Sectors

Sectors

Six sectors where on-site generation can make sense, and why.

Where it fits

Six sectors, one question: how does the building use energy?

Every site is different, so we look at the building before recommending anything. These are the patterns we look for.

  • Indoor swimming pool with blue tiles
    Leisure Centres & GymsPools, showers and sports halls need heat all day, every day. That steady demand is what CHP is built for.
  • Seating area in a hotel lobby
    HotelsHot water, laundry and heating around the clock, plus a large electrical base load for kitchens and rooms. Guest car parks can take EV charging.
  • Empty lecture hall with wooden desks and tall windows
    Education – Schools & UniversitiesLarge roofs for solar PV and campus heating loads, with term-time patterns to plan around.
  • Rows of empty yellow stadium seats
    Stadiums & Sports VenuesBig roof and car park areas for solar, event-day peaks in electricity demand, and car parks that suit EV charging for visitors.
  • Aisle on a factory floor beside a conveyor
    Manufacturing & Industrial SitesProcess heat and long running hours, where on-site generation can carry a large share of the load. Fleet vans and staff cars can charge on site too.
  • Server equipment in a data centre rack
    Data CentresA high, constant electrical load and a lot of waste heat to manage, all day, every day.

Not sure if your site fits?

Start with the building

Send us a year of energy bills and a few photos of the plant room and roof. We will tell you whether CHP, solar PV or EV charging is worth a closer look.

Stainless steel pipework and tanks in an industrial energy plant

Talk to us about your site

Tell us about your building and how it uses energy, and we will come back to you with a view on whether on-site generation makes sense for it.

Phone: 0161 564 0895 · Email: projects@echo-es.co.uk

Privacy Preference Center