Replacement boiler solution.....
Echo worked with Centrica Business Solutions and Siemens to replace the boilers within the Leisure Centre plantroom over a 5 day period while the Leisure Centre was shut due to the restrictions caused by the coronavirus pandemic.
- Suspendisse nec vulputate nulla iaculis
- Vulputate nulla - iaculis dolor vulputate nulla iaculis
- +100% of lorem ipsum eative volutpat donec
- Reative vel donec dolor
- Class aptent taciti sociosqu ad litora glavrida amet nulla
Design
Our in house design team developed 3D layout and fabrication drawings for the boiler positions and pipework fabrication detail. These where then approved by Centrica before going into manufacture.
De-commission & Positioning
Our team worked over the weekend with specialist lift & shift contractors, Lifting Projects, to de-commission the existing boilers and re-position the new boilers.
Installed & Commissioned
The full project was completed over a 5 day period, minimising the downtime for the Leisure Centre which had been re-purposed as a COVID-19 testing site.